200 MW
220 kV Selskaya substation 160 MW
110 kV Novoselki substation 40 MW
8,840 m3 / day
Can be increased to meet the needs of the resident
8,840 m3 / day
Municipal wastewater, storm sewer
28,950 m3 / h
Main gas pipeline, possibility of increasing volumes
100 km from Moscow
on the M4 DON highway
500 ha of total,
374 ha of usable area